VerifiedClimate™ operates as neutral evidentiary infrastructure for climate- and compliance-related declarations. All submitted materials are preserved within a secure, automated environment designed around confidentiality, integrity and availability.
The platform processes and stores data using enterprise-grade, independently audited cloud infrastructure. VerifiedClimate does not interpret, analyse or alter submitted content; all Records are issued and preserved automatically.
Submitted documents are handled by an access-controlled backend environment with:
a) Secure, independently audited cloud hosting.
b) Redundant storage and disaster-recovery capabilities.
c) Automated processing and file custody.
d) Strict segregation between operational layers.
e) No storage of sensitive files on the public-facing website.
f) All systems are designed to function as deterministic, neutral evidentiary infrastructure.
AES-256 encryption at rest.
TLS/HTTPS encryption in transit.
No human handling of submitted files.
Submitter-exclusive visibility.
No public disclosure unless explicitly enabled.
Compliance with GDPR, CCPA and major data-protection frameworks.
Least-privilege access across operational systems.
Segregated environments for development, staging and production.
Logged administrative access and activity trails.
No AI, machine learning or automated interpretation of content.
All workflows are deterministic and auditable.
Tamper-evident SHA-256 hashing.
RFC-3161 compatible timestamping.
Stable, non-editable reviewer-safe output formats.
No representation that supporting artefacts are immutable.
Records are preserved exactly as submitted, with cryptographic assurance of integrity.
Multi-zone, replicated storage.
Automatic failover.
High-availability delivery mechanisms.
Independent supplier audits including ISO and SOC standards.
VerifiedClimate does not claim:
a) Immutable evidence.
b) Blockchain backing.
c) Advisory or certification capabilities.
d) Replacement of official submission channels.
VerifiedClimate provides evidentiary custody only.
Planned developments include:
a) Independent penetration testing.
b) Optional jurisdictional data residency.
Further governance and assurance layers as part of the Series A cycle.
TRL-3 validation logged — Modular carbon-mineralisation reactor (Copenhagen · 2025-11-17T09:58 UTC)
.avif)
TRL-4 validation — High-efficiency seawater electrolysis cell (Valencia · 2025-11-14T10:48 UTC)
.avif)
Pilot-readiness declaration — Low-carbon cement curing protocol (Pune · 2025-11-14T09:32 UTC)
.avif)
Investor-briefing milestone — Energy-storage safety audit lodged (Helsinki · 2025-11-13T19:14 UTC)
.avif)
TRL-5 field test — Methane-leak quantification sensor array (Perth · 2025-11-13T17:58 UTC)
.avif)
Grant-supporting submission — Urban heat-resilience modelling package (Mexico City · 2025-11-13T16:21 UTC)
.avif)
Consortium-formation record — Bio-based composites scale-up group (Prague · 2025-11-13T14:47 UTC)
.avif)
TRL-3 confirmation — Agrivoltaic micro-tracking unit (Kigali · 2025-11-13T12:39 UTC)
.avif)
Feasibility-completion record — Geothermal heat-exchange retrofit study (Salt Lake City · 2025-11-13T11:05 UTC)
.avif)
Evidence-starter record — Renewable-energy procurement baseline declared (Porto · 2025-11-13T09:52 UTC)
.avif)
TRL-2 verification — Bio-enzymatic textile-recycling catalyst (Kyoto · 2025-11-13T08:18 UTC)
.avif)
TRL-4 integration record — Solar-thermal retrofit module (Athens · 2025-11-12T09:52 UTC)
.avif)
TRL-2 materials verification — Carbon-negative brick prototype (Belfast · 2025-11-12T08:11 UTC)
.avif)
TRL-5 operational update — Grid-balancing AI controller (Seoul · 2025-11-11T18:22 UTC)
.avif)
TRL-3 validation logged — Off-grid water purification unit (Nairobi · 2025-11-11T17:36 UTC)
.avif)
Investor-readiness filing — Green-ammonia pilot consortium (Oslo · 2025-11-11T16:47 UTC)
.avif)
Grant-supporting record — Industrial-heat recovery study (Turin · 2025-11-11T15:19 UTC)
.avif)
TRL-6 field demonstration — Modular battery-storage system (Rotterdam · 2025-11-11T13:28 UTC)
.avif)
TRL-4 subsystem integration — Low-carbon concrete additive (Brno · 2025-11-11T11:54 UTC)
.avif)
TRL-3 experimental milestone — CO₂-mineralisation binder (Leipzig · 2025-11-11T10:41 UTC)
.avif)
TRL-5 pilot verification — District-heating optimisation platform (Helsinki · 2025-11-11T09:14 UTC)
.avif)
TRL-1 concept declaration — Digital emissions ledger (Vancouver · 2025-11-11T08:33 UTC)
.avif)
TRL-2 laboratory validation — Seaweed-based biopolymer (Galway · 2025-11-11T07:56 UTC)
.avif)
Funding-round verification — Climate-technology venture (London · 2025-11-10T13:42 UTC)
.avif)
Post-deployment audit — Carbon-capture pilot (Houston · 2025-11-10T12:09 UTC)
.avif)
Compliance record published — ESG-reporting consortium (Copenhagen · 2025-11-10T11:18 UTC)
.avif)
TRL-8 field demonstration — Energy-retrofit accelerator (Dublin · 2025-11-10T10:22 UTC)
.avif)
Grant eligibility evidence filed — Sustainable-mobility initiative (Vienna · 2025-11-10T09:37 UTC)
.avif)
Operational record issued — Solar-microgrid installation (Kigali · 2025-11-10T08:44 UTC)
.avif)
Technology verification logged — Low-carbon construction process (Prague · 2025-11-10T07:12 UTC)
.avif)
Deployment completion — Municipal-waste-to-energy facility (Athens · 2025-11-09T16:55 UTC)
.avif)
Feasibility confirmation — Renewable-hydrogen pilot (Valencia · 2025-11-09T14:27 UTC)
.avif)
Certification review underway — Methane-leak-detection platform (Oslo · 2025-11-09T11:41 UTC)
.avif)
Policy-compliance filing submitted — Industrial-heat-recovery system (Brussels · 2025-11-09T09:02 UTC)
.avif)
Monitoring dataset verified — Nature-based carbon portfolio (Vancouver · 2025-11-09T07:23 UTC)
.avif)
TRL-7 performance audit logged — Direct-air-capture demonstration (Abu Dhabi · 2025-11-08T15:48 UTC)
.avif)
Site commissioning authorised — Offshore-wind logistics hub (Brest · 2025-11-08T12:15 UTC)
.avif)
Grant milestone recorded — Circular-materials programme (Edinburgh · 2025-11-08T09:37 UTC)
.avif)
Project extension approved — Climate-resilient agriculture initiative (Accra · 2025-11-08T07:58 UTC)
.avif)
Independent audit completed — Bio-methane recovery facility (Antwerp · 2025-11-07T17:26 UTC)
.avif)
TRL-6 validation dataset uploaded — Energy-storage pilot (Tallinn · 2025-11-07T14:09 UTC)
.avif)
Pilot verification initiated — Carbon-accounting software platform (Amsterdam · 2025-11-07T11:42 UTC)
.avif)
Regulatory submission acknowledged — Green-hydrogen partnership (Reykjavik · 2025-11-07T08:31 UTC)
.avif)
Grant milestone approved — Adaptation-finance programme (Dublin · 2025-11-06T10:12 UTC)
.avif)
Portfolio-tracking pilot initiated — Climate fund consortium (Geneva · 2025-11-04T09:33 UTC)
.avif)
TRL-6 certification audit — Energy-storage company (Melbourne · 2025-11-02T11:46 UTC)
.avif)
Pilot expansion authorised — Forest-carbon enterprise (Singapore · 2025-10-30T07:14 UTC)
.avif)
Site installation confirmed — Solar-desalination project (Dubai · 2025-10-28T08:37 UTC)
.avif)
Certification pathway approved — Carbon-credit registry integration (Zurich · 2025-10-25T11:23 UTC)
.avif)
Verification package — auditable record uploaded (Methane-measurement system, Santiago de Chile · 2025-10-23T12:51 UTC)
.avif)
Deployment phase initiated — Smart-agriculture network (Bangalore · 2025-10-22T08:55 UTC)
.avif)
Climate accelerator batch — Portfolio onboarding initiated (San Francisco · 2025-10-20T14:07 UTC)
.avif)
TRL-8 demonstration run — Waste-to-fuel operator (Toronto · 2025-10-17T15:09 UTC)
.avif)
Feasibility audit completed — Biogas upgrading venture (Munich · 2025-10-14T13:42 UTC)
.avif)
TRL-5 performance data — Water-quality monitoring (São Paulo · 2025-10-11T06:19 UTC)
.avif)
Field operation extended — phase 2 authorised (Direct-air-capture startup, Arizona · 2025-10-10T10:42 UTC)
.avif)
Regulatory filing submitted — Climate-risk software (New York · 2025-10-03T14:18 UTC)
.avif)
TRL-7 field integration completed — Energy-efficiency retrofit (Chicago · 2025-09-27T09:25 UTC)
.avif)
Technology validation — independent audit completed (Green-hydrogen developer, Cape Town · 2025-09-20T13:32 UTC)
.avif)
Pilot deployment verified — Renewable micro-grid operator (Nairobi · 2025-09-13T07:44 UTC)
.avif)
TRL-5 verification report issued — Carbon-capture unit (Warsaw · 2025-09-06T11:56 UTC)
.avif)
Policy-grant confirmation — Forestry monitoring programme (Helsinki · 2025-08-30T10:28 UTC)
.avif)
Independent review logged — Climate-finance platform (Paris · 2025-08-23T12:15 UTC)
.avif)
Funding milestone confirmed — Ocean-data analytics firm (Lisbon · 2025-08-16T08:41 UTC)
.avif)
TRL-4 validation — Carbon-mineralisation study (Berlin · 2025-08-09T09:18 UTC)
.avif)
Pilot facility commissioned — Hydrogen mobility project (Copenhagen · 2025-08-01T10:02 UTC)
.avif)
Prototype shipment verified — Battery-recycling plant (Rotterdam · 2025-07-25T18:43 UTC)
.avif)
TRL-6 system integration — EV-charging network (London · 2025-07-17T15:29 UTC)
.avif)
Pilot grant verification — Smart-grid consortium (Galway · 2025-07-09T11:11 UTC)
.avif)
TRL-5 milestone — Wind-retrofit startup (Shannon · 2025-07-02T07:32 UTC)
.avif)
Patent filing acknowledged — Biochar technology team (Dublin · 2025-06-25T09:47 UTC)
.avif)
Field-test data uploaded — Agri-methane reduction project (Berlin · 2025-06-18T16:05 UTC)
.avif)
Pilot installation recorded — Energy-storage demonstrator (Belfast · 2025-06-12T13:58 UTC)
.avif)
TRL-4 prototype completed — Low-carbon cement venture (Waterford · 2025-06-07T08:43 UTC)
.avif)
Feasibility study verified — Marine-carbon research unit (Limerick · 2025-06-02T10:26 UTC)
.avif)
Grant milestone submitted — Renewable-heating programme (Cork · 2025-05-27T14:37 UTC)
.avif)
Prototype test logged — Circular-materials project (Galway · 2025-05-24T11:02 UTC)
.avif)
TRL-3 lab validation — Carbon-removal pilot (Dublin · 2025-05-20T09:14 UTC)
.avif)
TRL-3 validation logged — Modular carbon-mineralisation reactor (Copenhagen · 2025-11-17T09:58 UTC)
.png)
TRL-4 validation — High-efficiency seawater electrolysis cell (Valencia · 2025-11-14T10:48 UTC)
.png)
Pilot-readiness declaration — Low-carbon cement curing protocol (Pune · 2025-11-14T09:32 UTC)
.png)
Investor-briefing milestone — Energy-storage safety audit lodged (Helsinki · 2025-11-13T19:14 UTC)
.png)
TRL-5 field test — Methane-leak quantification sensor array (Perth · 2025-11-13T17:58 UTC)
.png)
Grant-supporting submission — Urban heat-resilience modelling package (Mexico City · 2025-11-13T16:21 UTC)
.png)
Consortium-formation record — Bio-based composites scale-up group (Prague · 2025-11-13T14:47 UTC)
.png)
TRL-3 confirmation — Agrivoltaic micro-tracking unit (Kigali · 2025-11-13T12:39 UTC)
.png)
Feasibility-completion record — Geothermal heat-exchange retrofit study (Salt Lake City · 2025-11-13T11:05 UTC)
.png)
Evidence-starter record — Renewable-energy procurement baseline declared (Porto · 2025-11-13T09:52 UTC)
.png)
TRL-2 verification — Bio-enzymatic textile-recycling catalyst (Kyoto · 2025-11-13T08:18 UTC)
.png)
TRL-4 integration record — Solar-thermal retrofit module (Athens · 2025-11-12T09:52 UTC)
.png)
TRL-2 materials verification — Carbon-negative brick prototype (Belfast · 2025-11-12T08:11 UTC)
.png)
TRL-5 operational update — Grid-balancing AI controller (Seoul · 2025-11-11T18:22 UTC)
.png)
TRL-3 validation logged — Off-grid water purification unit (Nairobi · 2025-11-11T17:36 UTC)
.png)
Investor-readiness filing — Green-ammonia pilot consortium (Oslo · 2025-11-11T16:47 UTC)
.png)
Grant-supporting record — Industrial-heat recovery study (Turin · 2025-11-11T15:19 UTC)
.png)
TRL-6 field demonstration — Modular battery-storage system (Rotterdam · 2025-11-11T13:28 UTC)
.png)
TRL-4 subsystem integration — Low-carbon concrete additive (Brno · 2025-11-11T11:54 UTC)
.png)
TRL-3 experimental milestone — CO₂-mineralisation binder (Leipzig · 2025-11-11T10:41 UTC)
.png)
TRL-5 pilot verification — District-heating optimisation platform (Helsinki · 2025-11-11T09:14 UTC)
.png)
TRL-1 concept declaration — Digital emissions ledger (Vancouver · 2025-11-11T08:33 UTC)
.png)
TRL-2 laboratory validation — Seaweed-based biopolymer (Galway · 2025-11-11T07:56 UTC)
.png)
Funding-round verification — Climate-technology venture (London · 2025-11-10T13:42 UTC)
.png)
Post-deployment audit — Carbon-capture pilot (Houston · 2025-11-10T12:09 UTC)
.png)
Compliance record published — ESG-reporting consortium (Copenhagen · 2025-11-10T11:18 UTC)
.png)
TRL-8 field demonstration — Energy-retrofit accelerator (Dublin · 2025-11-10T10:22 UTC)
.png)
Grant eligibility evidence filed — Sustainable-mobility initiative (Vienna · 2025-11-10T09:37 UTC)
.png)
Operational record issued — Solar-microgrid installation (Kigali · 2025-11-10T08:44 UTC)
.png)
Technology verification logged — Low-carbon construction process (Prague · 2025-11-10T07:12 UTC)
.png)
Deployment completion — Municipal-waste-to-energy facility (Athens · 2025-11-09T16:55 UTC)
.png)
Feasibility confirmation — Renewable-hydrogen pilot (Valencia · 2025-11-09T14:27 UTC)
.png)
Certification review underway — Methane-leak-detection platform (Oslo · 2025-11-09T11:41 UTC)
.png)
Policy-compliance filing submitted — Industrial-heat-recovery system (Brussels · 2025-11-09T09:02 UTC)
.png)
Monitoring dataset verified — Nature-based carbon portfolio (Vancouver · 2025-11-09T07:23 UTC)
.png)
TRL-7 performance audit logged — Direct-air-capture demonstration (Abu Dhabi · 2025-11-08T15:48 UTC)
.png)
Site commissioning authorised — Offshore-wind logistics hub (Brest · 2025-11-08T12:15 UTC)
.png)
Grant milestone recorded — Circular-materials programme (Edinburgh · 2025-11-08T09:37 UTC)
.png)
Project extension approved — Climate-resilient agriculture initiative (Accra · 2025-11-08T07:58 UTC)
.png)
Independent audit completed — Bio-methane recovery facility (Antwerp · 2025-11-07T17:26 UTC)
.png)
TRL-6 validation dataset uploaded — Energy-storage pilot (Tallinn · 2025-11-07T14:09 UTC)
.png)
Pilot verification initiated — Carbon-accounting software platform (Amsterdam · 2025-11-07T11:42 UTC)
.png)
Regulatory submission acknowledged — Green-hydrogen partnership (Reykjavik · 2025-11-07T08:31 UTC)
.png)
Grant milestone approved — Adaptation-finance programme (Dublin · 2025-11-06T10:12 UTC)
.png)
Portfolio-tracking pilot initiated — Climate fund consortium (Geneva · 2025-11-04T09:33 UTC)
.png)
TRL-6 certification audit — Energy-storage company (Melbourne · 2025-11-02T11:46 UTC)
.png)
Pilot expansion authorised — Forest-carbon enterprise (Singapore · 2025-10-30T07:14 UTC)
.png)
Site installation confirmed — Solar-desalination project (Dubai · 2025-10-28T08:37 UTC)
.png)
Certification pathway approved — Carbon-credit registry integration (Zurich · 2025-10-25T11:23 UTC)
.png)
Verification package — auditable record uploaded (Methane-measurement system, Santiago de Chile · 2025-10-23T12:51 UTC)
.png)
Deployment phase initiated — Smart-agriculture network (Bangalore · 2025-10-22T08:55 UTC)
.png)
Climate accelerator batch — Portfolio onboarding initiated (San Francisco · 2025-10-20T14:07 UTC)
.png)
TRL-8 demonstration run — Waste-to-fuel operator (Toronto · 2025-10-17T15:09 UTC)
.png)
Feasibility audit completed — Biogas upgrading venture (Munich · 2025-10-14T13:42 UTC)
.png)
TRL-5 performance data — Water-quality monitoring (São Paulo · 2025-10-11T06:19 UTC)
.png)
Field operation extended — phase 2 authorised (Direct-air-capture startup, Arizona · 2025-10-10T10:42 UTC)
.png)
Regulatory filing submitted — Climate-risk software (New York · 2025-10-03T14:18 UTC)
.png)
TRL-7 field integration completed — Energy-efficiency retrofit (Chicago · 2025-09-27T09:25 UTC)
.png)
Technology validation — independent audit completed (Green-hydrogen developer, Cape Town · 2025-09-20T13:32 UTC)
.png)
Pilot deployment verified — Renewable micro-grid operator (Nairobi · 2025-09-13T07:44 UTC)
.png)
TRL-5 verification report issued — Carbon-capture unit (Warsaw · 2025-09-06T11:56 UTC)
.png)
Policy-grant confirmation — Forestry monitoring programme (Helsinki · 2025-08-30T10:28 UTC)
.png)
Independent review logged — Climate-finance platform (Paris · 2025-08-23T12:15 UTC)
.png)
Funding milestone confirmed — Ocean-data analytics firm (Lisbon · 2025-08-16T08:41 UTC)
.png)
TRL-4 validation — Carbon-mineralisation study (Berlin · 2025-08-09T09:18 UTC)
.png)
Pilot facility commissioned — Hydrogen mobility project (Copenhagen · 2025-08-01T10:02 UTC)
.png)
Prototype shipment verified — Battery-recycling plant (Rotterdam · 2025-07-25T18:43 UTC)
.png)
TRL-6 system integration — EV-charging network (London · 2025-07-17T15:29 UTC)
.png)
Pilot grant verification — Smart-grid consortium (Galway · 2025-07-09T11:11 UTC)
.png)
TRL-5 milestone — Wind-retrofit startup (Shannon · 2025-07-02T07:32 UTC)
.png)
Patent filing acknowledged — Biochar technology team (Dublin · 2025-06-25T09:47 UTC)
.png)
Field-test data uploaded — Agri-methane reduction project (Berlin · 2025-06-18T16:05 UTC)
.png)
Pilot installation recorded — Energy-storage demonstrator (Belfast · 2025-06-12T13:58 UTC)
.png)
TRL-4 prototype completed — Low-carbon cement venture (Waterford · 2025-06-07T08:43 UTC)
.png)
Feasibility study verified — Marine-carbon research unit (Limerick · 2025-06-02T10:26 UTC)
.png)
Grant milestone submitted — Renewable-heating programme (Cork · 2025-05-27T14:37 UTC)
.png)
Prototype test logged — Circular-materials project (Galway · 2025-05-24T11:02 UTC)
.png)
TRL-3 lab validation — Carbon-removal pilot (Dublin · 2025-05-20T09:14 UTC)
.png)