Municipal Biogas Upgrade (Stadtwerke Augsburg)

This project expands municipal anaerobic digestion capacity to process bio-waste at scale and upgrades output into grid-compatible biogas. The resulting fuel is injected directly into the district heating system, displacing fossil inputs and supporting regional decarbonisation goals. Implemented under Phase II of the city's climate strategy, the initiative is backed by regulatory commitments and cross-agency alignment. It forms part of a multi-year roadmap to achieve energy sovereignty and measurable emissions reductions.

Organisation

Stadtwerke Augsburg

Sector

Municipal & Public Sector

Region

Bavaria, Germany

Timestamp

2025-05-04T11:32:09Z

TrustMark visibility

Yes

Record Status

Verified

TRL-4 integration record — Solar-thermal retrofit module (Athens · 2025-11-12T09:52 UTC)

TRL-2 materials verification — Carbon-negative brick prototype (Belfast · 2025-11-12T08:11 UTC)

TRL-5 operational update — Grid-balancing AI controller (Seoul · 2025-11-11T18:22 UTC)

TRL-3 validation logged — Off-grid water purification unit (Nairobi · 2025-11-11T17:36 UTC)

Investor-readiness filing — Green-ammonia pilot consortium (Oslo · 2025-11-11T16:47 UTC)

Grant-supporting record — Industrial-heat recovery study (Turin · 2025-11-11T15:19 UTC)

TRL-6 field demonstration — Modular battery-storage system (Rotterdam · 2025-11-11T13:28 UTC)

TRL-4 subsystem integration — Low-carbon concrete additive (Brno · 2025-11-11T11:54 UTC)

TRL-3 experimental milestone — CO₂-mineralisation binder (Leipzig · 2025-11-11T10:41 UTC)

TRL-5 pilot verification — District-heating optimisation platform (Helsinki · 2025-11-11T09:14 UTC)

TRL-1 concept declaration — Digital emissions ledger (Vancouver · 2025-11-11T08:33 UTC)

TRL-2 laboratory validation — Seaweed-based biopolymer (Galway · 2025-11-11T07:56 UTC)

Funding-round verification — Climate-technology venture (London · 2025-11-10T13:42 UTC)

Post-deployment audit — Carbon-capture pilot (Houston · 2025-11-10T12:09 UTC)

Compliance record published — ESG-reporting consortium (Copenhagen · 2025-11-10T11:18 UTC)

TRL-8 field demonstration — Energy-retrofit accelerator (Dublin · 2025-11-10T10:22 UTC)

Grant eligibility evidence filed — Sustainable-mobility initiative (Vienna · 2025-11-10T09:37 UTC)

Operational record issued — Solar-microgrid installation (Kigali · 2025-11-10T08:44 UTC)

Technology verification logged — Low-carbon construction process (Prague · 2025-11-10T07:12 UTC)

Deployment completion — Municipal-waste-to-energy facility (Athens · 2025-11-09T16:55 UTC)

Feasibility confirmation — Renewable-hydrogen pilot (Valencia · 2025-11-09T14:27 UTC)

Certification review underway — Methane-leak-detection platform (Oslo · 2025-11-09T11:41 UTC)

Policy-compliance filing submitted — Industrial-heat-recovery system (Brussels · 2025-11-09T09:02 UTC)

Monitoring dataset verified — Nature-based carbon portfolio (Vancouver · 2025-11-09T07:23 UTC)

TRL-7 performance audit logged — Direct-air-capture demonstration (Abu Dhabi · 2025-11-08T15:48 UTC)

Site commissioning authorised — Offshore-wind logistics hub (Brest · 2025-11-08T12:15 UTC)

Grant milestone recorded — Circular-materials programme (Edinburgh · 2025-11-08T09:37 UTC)

Project extension approved — Climate-resilient agriculture initiative (Accra · 2025-11-08T07:58 UTC)

Independent audit completed — Bio-methane recovery facility (Antwerp · 2025-11-07T17:26 UTC)

TRL-6 validation dataset uploaded — Energy-storage pilot (Tallinn · 2025-11-07T14:09 UTC)

Pilot verification initiated — Carbon-accounting software platform (Amsterdam · 2025-11-07T11:42 UTC)

Regulatory submission acknowledged — Green-hydrogen partnership (Reykjavik · 2025-11-07T08:31 UTC)

Grant milestone approved — Adaptation-finance programme (Dublin · 2025-11-06T10:12 UTC)

Portfolio-tracking pilot initiated — Climate fund consortium (Geneva · 2025-11-04T09:33 UTC)

TRL-6 certification audit — Energy-storage company (Melbourne · 2025-11-02T11:46 UTC)

Pilot expansion authorised — Forest-carbon enterprise (Singapore · 2025-10-30T07:14 UTC)

Site installation confirmed — Solar-desalination project (Dubai · 2025-10-28T08:37 UTC)

Certification pathway approved — Carbon-credit registry integration (Zurich · 2025-10-25T11:23 UTC)

Verification package — auditable record uploaded (Methane-measurement system, Santiago de Chile · 2025-10-23T12:51 UTC)

Deployment phase initiated — Smart-agriculture network (Bangalore · 2025-10-22T08:55 UTC)

Climate accelerator batch — Portfolio onboarding initiated (San Francisco · 2025-10-20T14:07 UTC)

TRL-8 demonstration run — Waste-to-fuel operator (Toronto · 2025-10-17T15:09 UTC)

Feasibility audit completed — Biogas upgrading venture (Munich · 2025-10-14T13:42 UTC)

TRL-5 performance data — Water-quality monitoring (São Paulo · 2025-10-11T06:19 UTC)

Field operation extended — phase 2 authorised (Direct-air-capture startup, Arizona · 2025-10-10T10:42 UTC)

Regulatory filing submitted — Climate-risk software (New York · 2025-10-03T14:18 UTC)

TRL-7 field integration completed — Energy-efficiency retrofit (Chicago · 2025-09-27T09:25 UTC)

Technology validation — independent audit completed (Green-hydrogen developer, Cape Town · 2025-09-20T13:32 UTC)

Pilot deployment verified — Renewable micro-grid operator (Nairobi · 2025-09-13T07:44 UTC)

TRL-5 verification report issued — Carbon-capture unit (Warsaw · 2025-09-06T11:56 UTC)

Policy-grant confirmation — Forestry monitoring programme (Helsinki · 2025-08-30T10:28 UTC)

Independent review logged — Climate-finance platform (Paris · 2025-08-23T12:15 UTC)

Funding milestone confirmed — Ocean-data analytics firm (Lisbon · 2025-08-16T08:41 UTC)

TRL-4 validation — Carbon-mineralisation study (Berlin · 2025-08-09T09:18 UTC)

Pilot facility commissioned — Hydrogen mobility project (Copenhagen · 2025-08-01T10:02 UTC)

Prototype shipment verified — Battery-recycling plant (Rotterdam · 2025-07-25T18:43 UTC)

TRL-6 system integration — EV-charging network (London · 2025-07-17T15:29 UTC)

Pilot grant verification — Smart-grid consortium (Galway · 2025-07-09T11:11 UTC)

TRL-5 milestone — Wind-retrofit startup (Shannon · 2025-07-02T07:32 UTC)

Patent filing acknowledged — Biochar technology team (Dublin · 2025-06-25T09:47 UTC)

Field-test data uploaded — Agri-methane reduction project (Berlin · 2025-06-18T16:05 UTC)

Pilot installation recorded — Energy-storage demonstrator (Belfast · 2025-06-12T13:58 UTC)

TRL-4 prototype completed — Low-carbon cement venture (Waterford · 2025-06-07T08:43 UTC)

Feasibility study verified — Marine-carbon research unit (Limerick · 2025-06-02T10:26 UTC)

Grant milestone submitted — Renewable-heating programme (Cork · 2025-05-27T14:37 UTC)

Prototype test logged — Circular-materials project (Galway · 2025-05-24T11:02 UTC)

TRL-3 lab validation — Carbon-removal pilot (Dublin · 2025-05-20T09:14 UTC)

TRL-4 integration record — Solar-thermal retrofit module (Athens · 2025-11-12T09:52 UTC)

TRL-2 materials verification — Carbon-negative brick prototype (Belfast · 2025-11-12T08:11 UTC)

TRL-5 operational update — Grid-balancing AI controller (Seoul · 2025-11-11T18:22 UTC)

TRL-3 validation logged — Off-grid water purification unit (Nairobi · 2025-11-11T17:36 UTC)

Investor-readiness filing — Green-ammonia pilot consortium (Oslo · 2025-11-11T16:47 UTC)

Grant-supporting record — Industrial-heat recovery study (Turin · 2025-11-11T15:19 UTC)

TRL-6 field demonstration — Modular battery-storage system (Rotterdam · 2025-11-11T13:28 UTC)

TRL-4 subsystem integration — Low-carbon concrete additive (Brno · 2025-11-11T11:54 UTC)

TRL-3 experimental milestone — CO₂-mineralisation binder (Leipzig · 2025-11-11T10:41 UTC)

TRL-5 pilot verification — District-heating optimisation platform (Helsinki · 2025-11-11T09:14 UTC)

TRL-1 concept declaration — Digital emissions ledger (Vancouver · 2025-11-11T08:33 UTC)

TRL-2 laboratory validation — Seaweed-based biopolymer (Galway · 2025-11-11T07:56 UTC)

Funding-round verification — Climate-technology venture (London · 2025-11-10T13:42 UTC)

Post-deployment audit — Carbon-capture pilot (Houston · 2025-11-10T12:09 UTC)

Compliance record published — ESG-reporting consortium (Copenhagen · 2025-11-10T11:18 UTC)

TRL-8 field demonstration — Energy-retrofit accelerator (Dublin · 2025-11-10T10:22 UTC)

Grant eligibility evidence filed — Sustainable-mobility initiative (Vienna · 2025-11-10T09:37 UTC)

Operational record issued — Solar-microgrid installation (Kigali · 2025-11-10T08:44 UTC)

Technology verification logged — Low-carbon construction process (Prague · 2025-11-10T07:12 UTC)

Deployment completion — Municipal-waste-to-energy facility (Athens · 2025-11-09T16:55 UTC)

Feasibility confirmation — Renewable-hydrogen pilot (Valencia · 2025-11-09T14:27 UTC)

Certification review underway — Methane-leak-detection platform (Oslo · 2025-11-09T11:41 UTC)

Policy-compliance filing submitted — Industrial-heat-recovery system (Brussels · 2025-11-09T09:02 UTC)

Monitoring dataset verified — Nature-based carbon portfolio (Vancouver · 2025-11-09T07:23 UTC)

TRL-7 performance audit logged — Direct-air-capture demonstration (Abu Dhabi · 2025-11-08T15:48 UTC)

Site commissioning authorised — Offshore-wind logistics hub (Brest · 2025-11-08T12:15 UTC)

Grant milestone recorded — Circular-materials programme (Edinburgh · 2025-11-08T09:37 UTC)

Project extension approved — Climate-resilient agriculture initiative (Accra · 2025-11-08T07:58 UTC)

Independent audit completed — Bio-methane recovery facility (Antwerp · 2025-11-07T17:26 UTC)

TRL-6 validation dataset uploaded — Energy-storage pilot (Tallinn · 2025-11-07T14:09 UTC)

Pilot verification initiated — Carbon-accounting software platform (Amsterdam · 2025-11-07T11:42 UTC)

Regulatory submission acknowledged — Green-hydrogen partnership (Reykjavik · 2025-11-07T08:31 UTC)

Grant milestone approved — Adaptation-finance programme (Dublin · 2025-11-06T10:12 UTC)

Portfolio-tracking pilot initiated — Climate fund consortium (Geneva · 2025-11-04T09:33 UTC)

TRL-6 certification audit — Energy-storage company (Melbourne · 2025-11-02T11:46 UTC)

Pilot expansion authorised — Forest-carbon enterprise (Singapore · 2025-10-30T07:14 UTC)

Site installation confirmed — Solar-desalination project (Dubai · 2025-10-28T08:37 UTC)

Certification pathway approved — Carbon-credit registry integration (Zurich · 2025-10-25T11:23 UTC)

Verification package — auditable record uploaded (Methane-measurement system, Santiago de Chile · 2025-10-23T12:51 UTC)

Deployment phase initiated — Smart-agriculture network (Bangalore · 2025-10-22T08:55 UTC)

Climate accelerator batch — Portfolio onboarding initiated (San Francisco · 2025-10-20T14:07 UTC)

TRL-8 demonstration run — Waste-to-fuel operator (Toronto · 2025-10-17T15:09 UTC)

Feasibility audit completed — Biogas upgrading venture (Munich · 2025-10-14T13:42 UTC)

TRL-5 performance data — Water-quality monitoring (São Paulo · 2025-10-11T06:19 UTC)

Field operation extended — phase 2 authorised (Direct-air-capture startup, Arizona · 2025-10-10T10:42 UTC)

Regulatory filing submitted — Climate-risk software (New York · 2025-10-03T14:18 UTC)

TRL-7 field integration completed — Energy-efficiency retrofit (Chicago · 2025-09-27T09:25 UTC)

Technology validation — independent audit completed (Green-hydrogen developer, Cape Town · 2025-09-20T13:32 UTC)

Pilot deployment verified — Renewable micro-grid operator (Nairobi · 2025-09-13T07:44 UTC)

TRL-5 verification report issued — Carbon-capture unit (Warsaw · 2025-09-06T11:56 UTC)

Policy-grant confirmation — Forestry monitoring programme (Helsinki · 2025-08-30T10:28 UTC)

Independent review logged — Climate-finance platform (Paris · 2025-08-23T12:15 UTC)

Funding milestone confirmed — Ocean-data analytics firm (Lisbon · 2025-08-16T08:41 UTC)

TRL-4 validation — Carbon-mineralisation study (Berlin · 2025-08-09T09:18 UTC)

Pilot facility commissioned — Hydrogen mobility project (Copenhagen · 2025-08-01T10:02 UTC)

Prototype shipment verified — Battery-recycling plant (Rotterdam · 2025-07-25T18:43 UTC)

TRL-6 system integration — EV-charging network (London · 2025-07-17T15:29 UTC)

Pilot grant verification — Smart-grid consortium (Galway · 2025-07-09T11:11 UTC)

TRL-5 milestone — Wind-retrofit startup (Shannon · 2025-07-02T07:32 UTC)

Patent filing acknowledged — Biochar technology team (Dublin · 2025-06-25T09:47 UTC)

Field-test data uploaded — Agri-methane reduction project (Berlin · 2025-06-18T16:05 UTC)

Pilot installation recorded — Energy-storage demonstrator (Belfast · 2025-06-12T13:58 UTC)

TRL-4 prototype completed — Low-carbon cement venture (Waterford · 2025-06-07T08:43 UTC)

Feasibility study verified — Marine-carbon research unit (Limerick · 2025-06-02T10:26 UTC)

Grant milestone submitted — Renewable-heating programme (Cork · 2025-05-27T14:37 UTC)

Prototype test logged — Circular-materials project (Galway · 2025-05-24T11:02 UTC)

TRL-3 lab validation — Carbon-removal pilot (Dublin · 2025-05-20T09:14 UTC)