Summary of Declared Action
Placeholder
Organization name
Placeholder
General Sector
Placeholder
General Location
Placeholder
Primary purpose of submission
Placeholder
Timestamp of issuance
Placeholder
Record ID & Metadata
Placeholder
Cryptographic fingerprint (SHA256)
Placeholder
Supporting Documentation
Anyone with this unique VerifiedClimate™ URL can view all associated supporting documents
No record found with that ID.
TRL-4 integration record — Solar-thermal retrofit module (Athens · 2025-11-12T09:52 UTC)
.png)
TRL-2 materials verification — Carbon-negative brick prototype (Belfast · 2025-11-12T08:11 UTC)
.png)
TRL-5 operational update — Grid-balancing AI controller (Seoul · 2025-11-11T18:22 UTC)
.png)
TRL-3 validation logged — Off-grid water purification unit (Nairobi · 2025-11-11T17:36 UTC)
.png)
Investor-readiness filing — Green-ammonia pilot consortium (Oslo · 2025-11-11T16:47 UTC)
.png)
Grant-supporting record — Industrial-heat recovery study (Turin · 2025-11-11T15:19 UTC)
.png)
TRL-6 field demonstration — Modular battery-storage system (Rotterdam · 2025-11-11T13:28 UTC)
.png)
TRL-4 subsystem integration — Low-carbon concrete additive (Brno · 2025-11-11T11:54 UTC)
.png)
TRL-3 experimental milestone — CO₂-mineralisation binder (Leipzig · 2025-11-11T10:41 UTC)
.png)
TRL-5 pilot verification — District-heating optimisation platform (Helsinki · 2025-11-11T09:14 UTC)
.png)
TRL-1 concept declaration — Digital emissions ledger (Vancouver · 2025-11-11T08:33 UTC)
.png)
TRL-2 laboratory validation — Seaweed-based biopolymer (Galway · 2025-11-11T07:56 UTC)
.png)
Funding-round verification — Climate-technology venture (London · 2025-11-10T13:42 UTC)
.png)
Post-deployment audit — Carbon-capture pilot (Houston · 2025-11-10T12:09 UTC)
.png)
Compliance record published — ESG-reporting consortium (Copenhagen · 2025-11-10T11:18 UTC)
.png)
TRL-8 field demonstration — Energy-retrofit accelerator (Dublin · 2025-11-10T10:22 UTC)
.png)
Grant eligibility evidence filed — Sustainable-mobility initiative (Vienna · 2025-11-10T09:37 UTC)
.png)
Operational record issued — Solar-microgrid installation (Kigali · 2025-11-10T08:44 UTC)
.png)
Technology verification logged — Low-carbon construction process (Prague · 2025-11-10T07:12 UTC)
.png)
Deployment completion — Municipal-waste-to-energy facility (Athens · 2025-11-09T16:55 UTC)
.png)
Feasibility confirmation — Renewable-hydrogen pilot (Valencia · 2025-11-09T14:27 UTC)
.png)
Certification review underway — Methane-leak-detection platform (Oslo · 2025-11-09T11:41 UTC)
.png)
Policy-compliance filing submitted — Industrial-heat-recovery system (Brussels · 2025-11-09T09:02 UTC)
.png)
Monitoring dataset verified — Nature-based carbon portfolio (Vancouver · 2025-11-09T07:23 UTC)
.png)
TRL-7 performance audit logged — Direct-air-capture demonstration (Abu Dhabi · 2025-11-08T15:48 UTC)
.png)
Site commissioning authorised — Offshore-wind logistics hub (Brest · 2025-11-08T12:15 UTC)
.png)
Grant milestone recorded — Circular-materials programme (Edinburgh · 2025-11-08T09:37 UTC)
.png)
Project extension approved — Climate-resilient agriculture initiative (Accra · 2025-11-08T07:58 UTC)
.png)
Independent audit completed — Bio-methane recovery facility (Antwerp · 2025-11-07T17:26 UTC)
.png)
TRL-6 validation dataset uploaded — Energy-storage pilot (Tallinn · 2025-11-07T14:09 UTC)
.png)
Pilot verification initiated — Carbon-accounting software platform (Amsterdam · 2025-11-07T11:42 UTC)
.png)
Regulatory submission acknowledged — Green-hydrogen partnership (Reykjavik · 2025-11-07T08:31 UTC)
.png)
Grant milestone approved — Adaptation-finance programme (Dublin · 2025-11-06T10:12 UTC)
.png)
Portfolio-tracking pilot initiated — Climate fund consortium (Geneva · 2025-11-04T09:33 UTC)
.png)
TRL-6 certification audit — Energy-storage company (Melbourne · 2025-11-02T11:46 UTC)
.png)
Pilot expansion authorised — Forest-carbon enterprise (Singapore · 2025-10-30T07:14 UTC)
.png)
Site installation confirmed — Solar-desalination project (Dubai · 2025-10-28T08:37 UTC)
.png)
Certification pathway approved — Carbon-credit registry integration (Zurich · 2025-10-25T11:23 UTC)
.png)
Verification package — auditable record uploaded (Methane-measurement system, Santiago de Chile · 2025-10-23T12:51 UTC)
.png)
Deployment phase initiated — Smart-agriculture network (Bangalore · 2025-10-22T08:55 UTC)
.png)
Climate accelerator batch — Portfolio onboarding initiated (San Francisco · 2025-10-20T14:07 UTC)
.png)
TRL-8 demonstration run — Waste-to-fuel operator (Toronto · 2025-10-17T15:09 UTC)
.png)
Feasibility audit completed — Biogas upgrading venture (Munich · 2025-10-14T13:42 UTC)
.png)
TRL-5 performance data — Water-quality monitoring (São Paulo · 2025-10-11T06:19 UTC)
.png)
Field operation extended — phase 2 authorised (Direct-air-capture startup, Arizona · 2025-10-10T10:42 UTC)
.png)
Regulatory filing submitted — Climate-risk software (New York · 2025-10-03T14:18 UTC)
.png)
TRL-7 field integration completed — Energy-efficiency retrofit (Chicago · 2025-09-27T09:25 UTC)
.png)
Technology validation — independent audit completed (Green-hydrogen developer, Cape Town · 2025-09-20T13:32 UTC)
.png)
Pilot deployment verified — Renewable micro-grid operator (Nairobi · 2025-09-13T07:44 UTC)
.png)
TRL-5 verification report issued — Carbon-capture unit (Warsaw · 2025-09-06T11:56 UTC)
.png)
Policy-grant confirmation — Forestry monitoring programme (Helsinki · 2025-08-30T10:28 UTC)
.png)
Independent review logged — Climate-finance platform (Paris · 2025-08-23T12:15 UTC)
.png)
Funding milestone confirmed — Ocean-data analytics firm (Lisbon · 2025-08-16T08:41 UTC)
.png)
TRL-4 validation — Carbon-mineralisation study (Berlin · 2025-08-09T09:18 UTC)
.png)
Pilot facility commissioned — Hydrogen mobility project (Copenhagen · 2025-08-01T10:02 UTC)
.png)
Prototype shipment verified — Battery-recycling plant (Rotterdam · 2025-07-25T18:43 UTC)
.png)
TRL-6 system integration — EV-charging network (London · 2025-07-17T15:29 UTC)
.png)
Pilot grant verification — Smart-grid consortium (Galway · 2025-07-09T11:11 UTC)
.png)
TRL-5 milestone — Wind-retrofit startup (Shannon · 2025-07-02T07:32 UTC)
.png)
Patent filing acknowledged — Biochar technology team (Dublin · 2025-06-25T09:47 UTC)
.png)
Field-test data uploaded — Agri-methane reduction project (Berlin · 2025-06-18T16:05 UTC)
.png)
Pilot installation recorded — Energy-storage demonstrator (Belfast · 2025-06-12T13:58 UTC)
.png)
TRL-4 prototype completed — Low-carbon cement venture (Waterford · 2025-06-07T08:43 UTC)
.png)
Feasibility study verified — Marine-carbon research unit (Limerick · 2025-06-02T10:26 UTC)
.png)
Grant milestone submitted — Renewable-heating programme (Cork · 2025-05-27T14:37 UTC)
.png)
Prototype test logged — Circular-materials project (Galway · 2025-05-24T11:02 UTC)
.png)
TRL-3 lab validation — Carbon-removal pilot (Dublin · 2025-05-20T09:14 UTC)
.png)
TRL-4 integration record — Solar-thermal retrofit module (Athens · 2025-11-12T09:52 UTC)
.png)
TRL-2 materials verification — Carbon-negative brick prototype (Belfast · 2025-11-12T08:11 UTC)
.png)
TRL-5 operational update — Grid-balancing AI controller (Seoul · 2025-11-11T18:22 UTC)
.png)
TRL-3 validation logged — Off-grid water purification unit (Nairobi · 2025-11-11T17:36 UTC)
.png)
Investor-readiness filing — Green-ammonia pilot consortium (Oslo · 2025-11-11T16:47 UTC)
.png)
Grant-supporting record — Industrial-heat recovery study (Turin · 2025-11-11T15:19 UTC)
.png)
TRL-6 field demonstration — Modular battery-storage system (Rotterdam · 2025-11-11T13:28 UTC)
.png)
TRL-4 subsystem integration — Low-carbon concrete additive (Brno · 2025-11-11T11:54 UTC)
.png)
TRL-3 experimental milestone — CO₂-mineralisation binder (Leipzig · 2025-11-11T10:41 UTC)
.png)
TRL-5 pilot verification — District-heating optimisation platform (Helsinki · 2025-11-11T09:14 UTC)
.png)
TRL-1 concept declaration — Digital emissions ledger (Vancouver · 2025-11-11T08:33 UTC)
.png)
TRL-2 laboratory validation — Seaweed-based biopolymer (Galway · 2025-11-11T07:56 UTC)
.png)
Funding-round verification — Climate-technology venture (London · 2025-11-10T13:42 UTC)
.png)
Post-deployment audit — Carbon-capture pilot (Houston · 2025-11-10T12:09 UTC)
.png)
Compliance record published — ESG-reporting consortium (Copenhagen · 2025-11-10T11:18 UTC)
.png)
TRL-8 field demonstration — Energy-retrofit accelerator (Dublin · 2025-11-10T10:22 UTC)
.png)
Grant eligibility evidence filed — Sustainable-mobility initiative (Vienna · 2025-11-10T09:37 UTC)
.png)
Operational record issued — Solar-microgrid installation (Kigali · 2025-11-10T08:44 UTC)
.png)
Technology verification logged — Low-carbon construction process (Prague · 2025-11-10T07:12 UTC)
.png)
Deployment completion — Municipal-waste-to-energy facility (Athens · 2025-11-09T16:55 UTC)
.png)
Feasibility confirmation — Renewable-hydrogen pilot (Valencia · 2025-11-09T14:27 UTC)
.png)
Certification review underway — Methane-leak-detection platform (Oslo · 2025-11-09T11:41 UTC)
.png)
Policy-compliance filing submitted — Industrial-heat-recovery system (Brussels · 2025-11-09T09:02 UTC)
.png)
Monitoring dataset verified — Nature-based carbon portfolio (Vancouver · 2025-11-09T07:23 UTC)
.png)
TRL-7 performance audit logged — Direct-air-capture demonstration (Abu Dhabi · 2025-11-08T15:48 UTC)
.png)
Site commissioning authorised — Offshore-wind logistics hub (Brest · 2025-11-08T12:15 UTC)
.png)
Grant milestone recorded — Circular-materials programme (Edinburgh · 2025-11-08T09:37 UTC)
.png)
Project extension approved — Climate-resilient agriculture initiative (Accra · 2025-11-08T07:58 UTC)
.png)
Independent audit completed — Bio-methane recovery facility (Antwerp · 2025-11-07T17:26 UTC)
.png)
TRL-6 validation dataset uploaded — Energy-storage pilot (Tallinn · 2025-11-07T14:09 UTC)
.png)
Pilot verification initiated — Carbon-accounting software platform (Amsterdam · 2025-11-07T11:42 UTC)
.png)
Regulatory submission acknowledged — Green-hydrogen partnership (Reykjavik · 2025-11-07T08:31 UTC)
.png)
Grant milestone approved — Adaptation-finance programme (Dublin · 2025-11-06T10:12 UTC)
.png)
Portfolio-tracking pilot initiated — Climate fund consortium (Geneva · 2025-11-04T09:33 UTC)
.png)
TRL-6 certification audit — Energy-storage company (Melbourne · 2025-11-02T11:46 UTC)
.png)
Pilot expansion authorised — Forest-carbon enterprise (Singapore · 2025-10-30T07:14 UTC)
.png)
Site installation confirmed — Solar-desalination project (Dubai · 2025-10-28T08:37 UTC)
.png)
Certification pathway approved — Carbon-credit registry integration (Zurich · 2025-10-25T11:23 UTC)
.png)
Verification package — auditable record uploaded (Methane-measurement system, Santiago de Chile · 2025-10-23T12:51 UTC)
.png)
Deployment phase initiated — Smart-agriculture network (Bangalore · 2025-10-22T08:55 UTC)
.png)
Climate accelerator batch — Portfolio onboarding initiated (San Francisco · 2025-10-20T14:07 UTC)
.png)
TRL-8 demonstration run — Waste-to-fuel operator (Toronto · 2025-10-17T15:09 UTC)
.png)
Feasibility audit completed — Biogas upgrading venture (Munich · 2025-10-14T13:42 UTC)
.png)
TRL-5 performance data — Water-quality monitoring (São Paulo · 2025-10-11T06:19 UTC)
.png)
Field operation extended — phase 2 authorised (Direct-air-capture startup, Arizona · 2025-10-10T10:42 UTC)
.png)
Regulatory filing submitted — Climate-risk software (New York · 2025-10-03T14:18 UTC)
.png)
TRL-7 field integration completed — Energy-efficiency retrofit (Chicago · 2025-09-27T09:25 UTC)
.png)
Technology validation — independent audit completed (Green-hydrogen developer, Cape Town · 2025-09-20T13:32 UTC)
.png)
Pilot deployment verified — Renewable micro-grid operator (Nairobi · 2025-09-13T07:44 UTC)
.png)
TRL-5 verification report issued — Carbon-capture unit (Warsaw · 2025-09-06T11:56 UTC)
.png)
Policy-grant confirmation — Forestry monitoring programme (Helsinki · 2025-08-30T10:28 UTC)
.png)
Independent review logged — Climate-finance platform (Paris · 2025-08-23T12:15 UTC)
.png)
Funding milestone confirmed — Ocean-data analytics firm (Lisbon · 2025-08-16T08:41 UTC)
.png)
TRL-4 validation — Carbon-mineralisation study (Berlin · 2025-08-09T09:18 UTC)
.png)
Pilot facility commissioned — Hydrogen mobility project (Copenhagen · 2025-08-01T10:02 UTC)
.png)
Prototype shipment verified — Battery-recycling plant (Rotterdam · 2025-07-25T18:43 UTC)
.png)
TRL-6 system integration — EV-charging network (London · 2025-07-17T15:29 UTC)
.png)
Pilot grant verification — Smart-grid consortium (Galway · 2025-07-09T11:11 UTC)
.png)
TRL-5 milestone — Wind-retrofit startup (Shannon · 2025-07-02T07:32 UTC)
.png)
Patent filing acknowledged — Biochar technology team (Dublin · 2025-06-25T09:47 UTC)
.png)
Field-test data uploaded — Agri-methane reduction project (Berlin · 2025-06-18T16:05 UTC)
.png)
Pilot installation recorded — Energy-storage demonstrator (Belfast · 2025-06-12T13:58 UTC)
.png)
TRL-4 prototype completed — Low-carbon cement venture (Waterford · 2025-06-07T08:43 UTC)
.png)
Feasibility study verified — Marine-carbon research unit (Limerick · 2025-06-02T10:26 UTC)
.png)
Grant milestone submitted — Renewable-heating programme (Cork · 2025-05-27T14:37 UTC)
.png)
Prototype test logged — Circular-materials project (Galway · 2025-05-24T11:02 UTC)
.png)
TRL-3 lab validation — Carbon-removal pilot (Dublin · 2025-05-20T09:14 UTC)
.png)